Please be advised that the scheduled maintenance for SDDC Upgrade to VMC 1.3 (M3) was actually postponed. A new schedule will be sent at a later date
Notification: Upgrade has been scheduled for all SDDCs. The roll-out will happen in a phased manner. All upgrades will be performed during off-business after 6 PM PT.
Impact: VC will not be accessible during control plane update, existing Workloads will not be impacted.
Start Time: March 13, 2018 End Time: March 14, 2018 Duration: 2 Days
We’ll find your subscription and send you a link to login to manage your preferences.
We’ve found your existing subscription and have emailed you a secure link to manage your preferences.
We’ll use your email to save your preferences so you can update them later.
Subscribe to other services using the bell icon on the subscribe button on the status page.
You’ll no long receive any status updates from Sandbox, are you sure?
{{ error }}
We’ll no longer send you any status updates about Sandbox.